Pharmacy Practice Lab Renovations - Photos
The most recent photos are here; older ones are below.
Tuesday, October 16, 2006
 |
|
 |
| All of the furniture is in position |
|
and the instructional equipment has been installed. |
| |
 |
|
 |
| Left side, as seen from the instructor's station |
|
Center of the room, from the instructor's station |
| |
 |
|
|
| Right side, from the instructor's station |
|
|
| |
Thursday, September 28, 2006
 |
|
 |
| The furniture is being distributed |
|
and all of the monitors have been installed. |
| |
 |
|
 |
| Projectors have been installed in the conference rooms |
|
and the sinks have been connected. |
| |
Wednesday, September 20, 2006
 |
|
 |
| The lights are on, and the furniture has arrived. |
|
The first of four monitors has been installed. |
| |
 |
|
 |
| Each meeting room will have a ceiling projector and a combination whiteboard/bulletin board/projector screen. |
|
Some of the meeting rooms can be subdivided for smaller groups. |
| |
 |
|
 |
| One of the two front corners, with sinks and cabinets. |
|
View from the instructor's station. |
| |
Friday, September 8, 2006
 |
|
 |
| The walls are painted, the ceiling grid is up... |
|
...and the flooring is being installed. |
| |
Thursday, August 24, 2006
 |
|
 |
| All of the drywall is up... |
|
...and the electricians and plumbers are still at work. |
| |
Walls and Infrastructure - Wednesday, August 9, 2006
 |
|
 |
| Conduit installation continues near the ceiling. The black tube is part of a ductwork pressure test. |
|
Drywall is going up on the conference rooms. |
| |
 |
|
 |
| The holes in the floor now house junction boxes. |
|
Piping and conduit for the instructor's bench is installed and ready to be cut to length. |
| |
Wall Framing - Wednesday, August 2, 2006
 |
|
 |
| Wall framing continues. The wood blocks will support the cabinets when they are installed. |
|
Wiring conduit for the fire alarm system is going in. |
| |
Wall Framing - Monday, July 17, 2006
 |
|
 |
| The framing materials have arrived... |
|
... and the walls are going up. |
| |
 |
|
 |
| Conduits and pipes are still going in... |
|
...and the walls keep progressing. |
| |
Floor Prep - Tuesday, June 27
 |
|
 |
| Drilling thru the floor for plumbing connections... |
|
...making a nice row of holes where the new benches will go. |
| |
 |
|
 |
| Digging down very carefully... |
|
...to expose a glass acid drain. |
| |
Ductwork - Monday, June 12
 |
|
 |
| The HVAC ductwork has arrived... |
|
...piles and piles of it! |
| |
 |
|
 |
| It's all being checked ... |
|
...assembled... |
| |
 |
|
 |
| ...adjusted... |
|
...and installed. |
Phase 2 - Preparation - Thursday, June 1
 |
|
 |
| Demolition is over; you can see where the walls were... |
|
...and where new doorways have been made. |
| |
Phase 1 - Demolition - Thursday, May 11
 |
|
 |
| Sledgehammer 101: Ready... |
|
...Aim... |
| |
 |
|
 |
| ... THUD! - all day long! |
|
Check the other side |
| |
 |
|
 |
| A little work with a hammer... |
|
...and the walls come tumbling down! |
| |
 |
|
 |
| In the next room, the pipes are coming out. |
|
The foreman keeps track of it all. |
| |
Phase 1 - Demolition - Monday, May 8
 |
|
 |
| The cabinets are gone... |
|
... and the conduits are coming down. |
| |
 |
|
 |
| The walls are bare... |
|
... and the ceilings are missing. |
| |
 |
|
 |
| More wires are exposed... |
|
... and hit the floor. |
Phase 1 - Demolition - Friday, May 5
 |
|
 |
| Removing plumbing |
|
Old cabinets stacked in the hallway |
| |
 |
|
 |
| Disconnecting wires where the cabinets were... |
|
... and everywhere else |
| |
 |
|
|
| Disconnecting electrical circuits |
|
|
|